Status: ARCHIVED
Abstract: This data set contains Spectroscopic, Continuum and Engineering data taken by the Microwave Instrument for the Rosetta Orbiter (MIRO) during the second cruise phase of the mission. The data consist primarily of observations of comet 9P/Tempel 1 before, during and after the planned collision of the Deep Impact mission impactor spacecraft with that comet in July 2005. The data are presented as a series of binary table files.
RO-C-MIRO-2-CR2-9P-TEMPEL1-V1.0 [Errata] | Browse | Download (271.5 MB) |
Citation to use when referencing this data set: "Gulkis, S., Backus, C.R., Janssen, M.A., Kamp, L.W. et al., ROSETTA MIRO INSTRUMENT RAW DATA FOR THE SECOND CRUISE PHASE, RO-C-MIRO-2-CR2-9P-TEMPEL1-V1.0, ESA Planetary Science Archive and NASA Planetary Data System, 2010."
Useful links: