# $Log: OIOR_PI6RSO_D_0012_MR_02____.ITL,v $ # # Revision 1.2 2008/04/09 18:53:16 kwirth # Checked and modified by K.R. Wirth on 9 Apr 2008. # # Revision 1.1 2008/04/09 11:19:28 kwirth # Preliminary Steins MR02 OIOR sent by L. Kamp via e-mail on 6 Apr 2008. # # Initial OIOR for Steins approach observations - 2008/04/07 - L.Kamp # #=======================================================================================# # Filename: OIOR_PI6RSO_D_0012_MR_03____vvvvv.ROS # Type: Orbiter Instrument Operation Request file # # Description: Observations of Steins on approach # # Author: Lucas Kamp # # JPL # # Date: 03 Apr 2008 # # (c) ESA/Estec # #=======================================================================================# # This uses relative timing. The events are in the instrument level ITL. # Times are relative to the first mode change to CTS/DualC, which is the start of # scientific data acquisition, even though it will be Dark Sky for the initial 3+ hours. # (Could also use times relative to estimated acquisition of signal = CA - 1 hour.) Version: 00001 Ref_date: 01-Jan-2000 # Irrelevant because will be overridden by top-level ITL, but needed for ORFA. Start_time: -000_00:22:00 End_time: +000_04:49:12 #=======================================================================================# Description: "1. | Start of sequence." #=======================================================================================# -00:22:00 MIRO OFF AMRF001A # Power On MIRO via OBCP -00:20:00 MIRO Engineering AMRF001B # MIRO Patch -00:19:00 MIRO Engineering AMRS613A # Software Restart #=======================================================================================# Description: "2. | Warm up instrument." #=======================================================================================# -00:16:00 MIRO Engineering AMRF008A # "MIRO USO ON v06" -00:13:00 MIRO Engineering AMRF007A # "MIRO Cal Heat On v04" -00:10:00 MIRO Engineering AMRF009A # "MIRO CTS Warm-up v06" #=======================================================================================# Description: "3. | Change the HK Cycle Skip to prevent interference with CTS timing." #=======================================================================================# -00:05:00 MIRO Engineering AMRS624A(\ # Miro Eng data slw VMRG0030 = 5) # Eng_HK_Cycle_Skip #=======================================================================================# Description: "4. | Go to CTS/DualC as soon as possible in order to stabilize." #=======================================================================================# 00:00:00 MIRO Engineering AMRF011A # CTS/Dual Continuum #=======================================================================================# Description: "5. | After initial stabilization, do CTS internal calibration to improve" Description: " | accuracy." #=======================================================================================# +01:30:00 MIRO CTS_DualCntm AMRF030A # "CTS Internal Cal v03" #=======================================================================================# # Commented out last message as EPS flags an Error: Messages found after last timeline entry. # Description: "6. | During the actual observations we just remain in CTS/DualC mode." # Description: " | End of sequence at +04:49:12. MR03 follows." #=======================================================================================#