Program: Deep Impact Dates: July 2, 2002 Ball Test Procedure(s): 564434, 564451 Description: Deep Impact Spectral Imaging Module, first cold test Comments by Don Hampton: Sixth day of test. This day completes the dry-run of the calibration procedure. Several flatfield images were taken as well as a repeat of the Kr and Ar lamps. The SIM bench temperature was ~142 K. With days 4, 5 and 6 there are three different bench temperatures.