This document highlights the NGIMS hardware/software/GSE milestones. 1.0 Deliverable Documents Interface control document between Flight Computer and Analog systems Interface Control Document between Digital FC and Analog FC Control Doc to Sensor Control Doc to Instrument Spacecraft Interface - from APL Agreement on Release Copy of Block Diagram (controlled document) Control Doc to 1553 GSE interface specifications Motherboard interface control document Hardware EGSE design concept Software EGSE design Concept Flight Software Requirements Document Flight Software Interface Specifications Document 2.0 GSE 1553 Interface PC with 1553 interface hardware 1553 GSE interface software GSE Workstation Hardware GSE Workstation Software 1. data display 2. data commanding 3. data analysis 3.0 Instrument Hardware Boards Deliverables Block Diagram Schematics (pdf format) Netlist Part List Layout Description Document (example memory map, special concept for fil boards) Assembly Procedures Module Test Connectors, Cables, Boxes, Fixtures Module Test Procedure (Specs out the neccesary hardware for the test) Hardware board 4.0 Special Tests Preliminary Filament PCB test (tests a Filament board and a Filament) Preliminary RF PCB test (test serial interface through floating interface) Preliminary Analog Digital PCB interface test Time permitting, valve driver test 5.0 Deliverables from SPRL Test board for testing rod A/C interface (Test float serial interface) Preliminary Electronic Integration and Test Procedure GSE System #1 GSE System #2 GSE System #3 6.0 Deliverables from GSFC Low Voltage Power Supply Frame Card cage frame for fit test RF tank box 7.0 Bench Tests Pre-KIWI release of flight software Pre-KIWI release of GSE software One week KIWI End to End test between 8/00 and 10/00 Mechanical Fit Test of all electronic modules and card cage frame Pre-E2E bench test release of flight software Pre-E2E bench test release of GSE software Electronics End to End Bench Test * Develop Functional Test Develop Baseline Test Develop Calibration Sequences Electronics Test with Analyzer on the Vacuum system Select Assembly and Test Values Install SAT values Update new release of drawings Pre-Calibration release of flight software Pre-Calibration release of GSE software Gas Calibration of Analyzer Final Changes to SAT values Pre-final assembly release of GSE software Pre-final assembly release of flight software Change EPROMs as neccesary Electronic end to end test without Analyzer Coat and stake boards Gas calibration of Analyzer under temperature Bake out and pinch off Analyzer Final Instrument Assembly Functional Test of Instrument Baseline Test of Instrument *uncoated and unstaked boards NB: The individual electronic modules will be temperature tested. The completed instrument will be tested in thermal vacuum. No other tests are planned. NGIMS Milestones J. Maurer & F. Tan Page 1 of 1 07/11/03