tracking test script "short" version: ------------------------------------- 1) run encounter_sim_setup.prc first 2) since using the new flight computer, need to upload additional alignment matrix parameter block to the test bed, called.. V307_test_pbl3.prc (run this after running encounter_sim_setup.prc) Additional g&c setup per Gabe.. 3) make sure met is well before 43152660 4) run TRACKTEST_UPLOAD_127_1.prc - (loads is the short test) 5) run tt_load_dpu_macros.prc (load dpu macros) 6) run L0C0H130_crisp_tpu_ds.prc (load the ephem to TPU) 8) rtc CRS_CA_RESET 9) rtc CRS_CA_START good_target (FIRST TIME, wait until after first slew has completed in seq) 10) rtc GC_CRISP_RL_CORR 1 (== use roll correction) 11) rtc GC_CA enable 12) rtc CD_TIME 43152600 13) rtc cd_macro_exec_1016 to repeat: start on line 6 above load new ephem, etc... FILES are located in: /project/contour/database/procedures/iandt/ann tt_load_dpu_macros.prc L0C0H130_crisp_tpu_ds.prc, etc